Key Project Milestones
LOCATION | SCOPE OF WORK | ANTICIPATED LETTING |
State Route 13 (Church Street) (Viaduct bridge) | Bridge Replacement | Summer 2023 |
Waverly Bypass (US 70) | Fence Replacement | In Progress |
Various State Routes | Guardrail Repair/Replacement | Completed |
State Route 1 (US 70) bridges over Trace Creek (near Scepter Road) | Bridge Replacement | Winter 2022-2023 |
Bakerville Road bridge over Duck River | Bridge Replacement | Summer 2023 |
East Blue Creek Road bridge over Blue Creek | Bridge Replacement - Construction of a 2-lane, 100-foot three span prestressed concrete girder bridge with shoulders | Winter 2022/23 |
Blue Creek Road bridge over Blue Creek | Bridge Replacement - Construct a 2-lane 100-foot three span prestressed concrete girder bridge with shoulders. | Winter 2022/23 |
Tatum Lane bridge over Blue Creek | Bridge Replacement. The proposed structure will be a two span pre-stressed concrete structure, with a proposed alignment shift of twenty-one feet to the east. The project will also include utility relocation | Fall 2022 |
Weed Lane bridge over Blue Creek | Bridge replacement | Spring 2023 |
State Route 230 over Hurricane Creek and Overflow | Bridge replacement | Active Completion Date: summer 2023 |
Tumbling Creek Road bridge over Tumbling Creek | Bridge Replacement. Construction of a 2-lane 140-foot three-span prestressed concrete girder bridge with shoulders. | Spring 2023 |
Cedar Grove Road over Hurricane Creek | Bridge Replacement. The proposed bridge is to be a three-hundred (300) feet long, three (3) span concrete beam bridge with an out-to-out width of twenty-five (25) feet three (3) inches. The proposed grade of the bridge will be approximately one (1) foot higher than the existing structure and the exiting centerline will be maintained. | Spring 2024 |
Interstate 40 Bridges over Buffalo River & Squeeze Bottom Lane | Bridge replacement | Winter 2022-2023 |
Crockett Murphree Lane bridge over I-40 (mile marker 145) | Bridge Replacement | Summer 2024 |
State Route 320 between Bucksnort and Nunnelly | Bridge replacement | "Active Comp Date 6/30/23" |