EC-STR-25

TEMPORARY CULVERT CROSSING, CONSTRUCTION EXIT, CONSTRUCTION FORD
EC-STR-25

(Click image to open PDF)

Related Standard Drawings

DRAWINGDESCRIPTIONREMARKS
EC-STR-32TEMPORARY DIVERSION CULVERTSSEE STANDARD DRAWING FOR ADDITIONAL DETAILS
   
   

Related Item Numbers

ITEM NO.U/MDESCRIPTIONREMARKS
203-01C.Y.ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) 
621-03.02L.F.18" TEMPORARY DRAINAGE PIPE 
621-03.03L.F.24" TEMPORARY DRAINAGE PIPE 
621-03.04L.F.30" TEMPORARY DRAINAGE PIPE 
621-03.05L.F.36" TEMPORARY DRAINAGE PIPE 
621-03.06L.F.42" TEMPORARY DRAINAGE PIPE 
621-03.07L.F.48" TEMPORARY DRAINAGE PIPE 
621-03.08L.F.54" TEMPORARY DRAINAGE PIPE 
621-03.09L.F.60" TEMPORARY DRAINAGE PIPE 
621-03.10L.F.66" TEMPORARY DRAINAGE PIPE 
621-03.11L.F.72" TEMPORARY DRAINAGE PIPE 
709-05.05TONMACHINED RIP-RAP (CLASS A-3) 
709-05.06TONMACHINED RIP-RAP (CLASS A-1) 
740-10.03S.Y.GEOTEXTILE (TYPE III)(EROSION CONTROL) 

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
10-26-1992 | 12-18-1995 | 05-27-2001 | 12-18-2002 | 01-22-2003 | 07-29-2003 | 04-15-2006 | 04-01-2008 | 08-01-2012
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 12, 2024 at 11:37 AM