T-WZ-55

SIDEWALK TRAFFIC CONTROL
T-WZ-55

(Click image to open PDF)

Latest Revision Note

10/29/2021    SIDEWALK DIVERSION SIDEWALK CLOSURE MIDBLOCK AND CORONER DRAWINGS WERE REDRAWN. PLYWOOD CURB RAMP DETAIL WAS REMOVED. TEMPORARY PEDESTRIAN ACCESS ROUTES PERPENDICULAR AND PARALLEL CURB RAMP OPTIONS WERE ADDED. CHANNELIZATION DEVICE LEGEND WAS REVISED. FOOTNOTES (1) WAS REVISED. GENERAL NOTES FOR SIDEWALK DIVERSION (G) AND SIDEWALK CLOSURE (A) WERE REVISED

Related Standard Drawings

DRAWINGDESCRIPTIONREMARKS
T-WZ-PBR SERIESWORK ZONE STANDARD DRAWINGSFOR PORTABLE BARRIER RAIL
T-WZ-PCB SERIESWORK ZONE STANDARD DRAWINGSFOR PORTABLE BARRIER RAIL
T-WZ-SERIESWORK ZONE STANDARD DRAWINGSREFER FOR MORE DETAILS

Related Item Numbers

ITEM NO.U/MDESCRIPTION
707-11.01LFPEDESTRIAN CONSTRUCTION BARRIER FENCE
712-04.01EACHFLEXIBLE DRUMS (CHANNELIZING)
712-06S.F.SIGNS (CONSTRUCTION)
712-07.02L.F.TEMPORARY BARRICADES (TYPE II)
712-07.03L.F.TEMPORARY BARRICADES (TYPE III)

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
02-29-2012 | 06-30-2014 | 10-10-2016 | 10-29-2021
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 12, 2024 at 11:37 AM