Natural Stream Design

Revised: June 28, 2024
DEFLECTORS, VANES & ENERGY DISSIPATORS
DRAWINGRELATED IBREVISION DATEDESCRIPTION
 
05/01/2020
LONGITUDINAL STONE TOE
 05/01/2020
BOULDER CLUSTERS
 05/01/2020
BOULDER CROSS VANE
 05/01/2020
BOULDER CROSS VANE WITH STEP
 05/01/2020
BOULDER W-WEIR
 05/01/2020
BOULDER VANES AND J-HOOK
 11/30/2020
LOG VANES, ROOT WADS, AND BOULDER J-HOOK
 11/30/2020LOG AND BOULDER STEP POOLS
 05/01/2020
BOULDER RIFFLES
 11/30/2020
LOG RIFFLES
 05/01/2020
CONSTRUCTED ALLUVIAL RIFFLE
 05/01/2020
SUBSTRATE RESTORATION
 05/01/2020
CLAY CHANNEL PLUG
D-NSD-32   05/01/2020WOOD TOE WITH GEO-LIFTS
D-NSD-32A   05/01/2020BOULDER TOE WITH GEO-LIFTS
D-NSD-33   05/01/2020COIR FIBER EROSION CONTROL BLANKET AND COIR FIBER ROLLS
D-NSD-34   05/01/2020LIVE STAKES AND LIVE SILTATION
D-NSD-35   05/01/2020LIVE FASCINES
D-NSD-36   05/01/2020BRUSH MATTRESS
D-NSD-37   05/01/2020SPECIAL NOTES FOR NATURAL STREAM DESIGN
    

If you find any mistakes, missing information or have a question, contact:
TDOT Engineering Production Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.EngineeringProductionSupport@tn.gov

This Page Last Updated: June 28, 2024 at 4:38 PM