Multimodal

Revised: July 31, 2024
CURB RAMPS
DRAWINGRELATED IBREVISION DATEDESCRIPTION
MM-CR-1   06/28/2019
DETECTABLE WARNING SURFACE PLACEMENT ON CURB RAMPS
MM-CR-2 
 
PERPENDICULAR CURB RAMP
MM-CR-3 
 
PARALLEL CURB RAMP
MM-CR-4  PEDESTRIAN REFUGE
MM-CR-5   06/28/2019SINGLE CROSSING CURB RAMP IN CURVE
MM-CR-6  DUAL CROSSING CURB RAMP PLACED OUTSIDE CURVE
MM-CR-7  CURB RAMPS IN CURVE Bl-DIRECTIONAL DUAL CROSSING
MM-CR-8  MONO-DIRECTIONAL SINGLE CROSSWALK CURB RAMP DETAILS
MM-CR-9  ALTERNATIVE CURB RAMP DETAILS
    

PAVEMENT MARKING
DRAWINGRELATED IBREVISION DATEDESCRIPTION
MM-PM-1 
 
SIGNING AND PAVEMENT MARKINGS AT INTERSECTION CROSSINGS FOR SHARED-USE PATHS
MM-PM-2 07/30/2024
SIGNING AND PAVEMENT MARKINGS FOR BICYCLE LANE OR ROUTES
MM-PM-3 
06/15/2021
SIGNING AND PAVEMENT MARKINGS FOR BICYCLE LANES ON URBAN ROADWAYS
MM-PM-4  
SIGNING AND PAVEMENT MARKINGS FOR BICYCLE LANES
MM-PM-5 
05/04/2022
SIGNING AND PAVEMENT MARKINGS FOR BICYCLE LANES AT INTERSECTIONS
    

SAFETY RAIL
DRAWINGRELATED IBREVISION DATEDESCRIPTION
MM-BPR-1   
07/30/2024
BIKE AND PEDESTRIAN SAFETY RAIL
MM-BPR-2   
10/16/2020
BIKE AND PEDESTRIAN MEDIAN BARRIER RAIL
MM-BPR-3
  BARRIER SLOPED END TREATMENT
MM-VPR-1    VEHICLE AND PEDESTRIAN SAFETY RAIL
    

SIDEWALK
DRAWINGRELATED IBREVISION DATEDESCRIPTION
MM-PS-1  DETAILS FOR PEDESTRIAN STEPS AND HANDRAILS
MM-SW-1  IB 23-11
07/07/2023
DETAILS FOR CONCRETE SIDEWALK
MM-SW-2 
 
ALTERNATE DETAILS FOR CONCRETE SIDEWALK (REHABILITATION)
    

TYPICAL SECTION
DRAWINGRELATED IBREVISION DATEDESCRIPTION
MM-BS-1IB 24-03 TYPICAL BUS STOP LOCATION
MM-TS-1 06/15/2021
BIKE ACCOMMODATION DESIGN GUIDANCE
MM-TS-2 
06/15/2021
LATERAL OFFSETS FOR SIDEWALK AND SHARED USE PATH
MM-TS-3 07/30/2024SEPARATED SHARED USE PATH TYPICAL SECTIONS
    

If you find any mistakes, missing information or have a question, contact:
TDOT Engineering Production Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.EngineeringProductionSupport@tn.gov

This Page Last Updated: August 1, 2024 at 8:36 AM