Design - Traffic Control

Revised: April 1, 2024

NOTE - This page an all of its child pages on the menu to the left have been transitioned to the  Engineering Production Support web site. These pages will remain temporarily but will no longer be updated. Please update your links.

PAVEMENT MARKINGS
DRAWINGRELATED IBREVISION DATEDESCRIPTION
 
06/28/2019
DETAILS OF PAVEMENT MARKINGS FOR CONVENTIONAL ROADS AND MARKING ABBREVIATIONS
IB 24-03
01/09/2024
DETAILS OF PAVEMENT MARKINGS FOR CONVENTIONAL ROADS
IB 23-11
07/07/2023
MARKING STANDARDS FOR TRAFFIC ISLANDS, PAVED SHOULDERS AND MEDIANS FOR CONVENTIONAL ROADS
 
07/17/2020
STANDARD INTERSECTION PAVEMENT MARKINGS
T-M-4AIB 23-0403/01/2023STANDARD UNSIGNALIZED MID-BLOCK CROSSING
T-M-4BIB 23-0403/01/2023STANDARD SIGNALIZED MID-BLOCK CROSSING 
T-M-4C  PEDESTRIAN GATEWAY TREATMENT 
IB 23-04
03/01/2023
MARKING DETAIL FOR FREEWAYS
IB 23-04
03/01/2023
MARKING DETAIL FOR EXPRESSWAY & FREEWAY INTERCHANGES
 
06/28/2019
GORE MARKING DETAILS FOR EXPRESSWAY & FREEWAY INTERCHANGES
 
06/28/2019
MARKING DETAILS FOR EXPRESSWAYS & FREEWAYS
IB 23-11
05/01/2023
PAVEMENT MARKING AND SIGNING DETAILS FOR RAMP INTERSECTIONS
T-M-9AIB 23-11 PAVEMENT MARKING AND SIGNING DETAILS FOR RAMP INTERSECTIONS
T-M-9BIB 23-11 PAVEMENT MARKING AND SIGNING DETAILS FOR RAMP INTERSECTIONS
 06/28/2019
ASPHALT SHOULDER RUMBLE STRIP INSTALLATION DETAILS FOR INTERSTATES AND ACCESS CONTROLLED ROUTES
 
06/28/2019
ASPHALT SHOULDER RUMBLE STRIP INSTALLATION DETAILS FOR NON-ACCESS CONTROLLED RURAL ROUTES
 
03/04/2021
RUMBLE STRIPE INSTALLATION LAYOUT
 
02/03/2020
RUMBLE STRIPE DETAILS FOR EDGE OF PAVEMENT AND CENTERLINE
 
05/04/2022
PAVEMENT MARKING DETAILS FOR ROUNDABOUTS
T-M-18 10/29/2021FLEXIBLE DELINEATOR DETAILS
T-M-18A  DELINEATOR MOUNTING DETAILS
T-M-19IB 24-0301/09/2024PAVEMENT MARKING DETAILS FOR RESTRICTED CROSSING & J-TURN INTERSECTIONS
    

WORK ZONES
DRAWINGRELATED IBREVISION DATEDESCRIPTION
 
04/02/2012
ADVANCE ROAD WORK SIGNING ON HIGHWAYS AND FREEWAYS
 
03/04/2021
ONE LANE CLOSURE DETAIL ON DIVIDED HIGHWAYS
 
03/04/2021
ONE LANE CLOSURE DETAIL FOR BRIDGES ON DIVIDED HIGHWAYS
 05/01/2020
TWO-OUTSIDE LANE CLOSURE FOR EXPRESSWAY AND FREEWAYS
 03/04/2021
TWO-OUTSIDE LANE CLOSURE FOR INTERSTATES AND EXPRESSWAYS
 05/01/2020
INTERIOR LANE CLOSURE FOR FREEWAYS
 03/04/2021
LANE SHIFT FOR DIVIDED HIGHWAYS AND FREEWAYS
IB 23-1107/07/2023
SHOULDER CLOSURE DETAIL FOR FREEWAYS AND DIVIDED HIGHWAYS
 03/04/2021
MEDIAN CROSS-OVER DETAIL ON FREEWAYS
 
12/18/1999
GEOMETRIC MEDIAN CROSS-OVER DETAIL ON DIVIDED HIGHWAYS
 05/01/2020
LANE CLOSURE WITH LEFT HAND MERGE AND LANE SHIFT
 
09/01/2005
TRAFFIC CONTROL 2-LANE, 2-WAY DIVERSION (40 MPH OR LESS)
 
09/01/2005
TRAFFIC CONTROL 2-LANE, 2-WAY DIVERSION (GREATER THAN 40 MPH)
 
11/30/2020
TRAFFIC CONTROL PLAN SIGNAL LAYOUT FOR TRAFFIC SIGNAL AT TWO LANE BRIDGE RECONSTRUCTION SITE
 
05/27/1998
TRAFFIC CONTROL PLAN FOR CLOSE INTERSECTION CONDITIONS USING TRAFFIC SIGNAL AT TWO LANE BRIDGE RECONSTRUCTION SITE
 
09/01/2005
TRAFFIC CONTROL PLAN GENERAL NOTES FOR TRAFFIC SIGNAL AT TWO LANE BRIDGE RECONSTRUCTION SITE
 
04/02/2012
TRAFFIC CONTROL PLAN PAY ITEM AND SIGN DETAILS FOR TRAFFIC SIGNAL AT TWO LANE BRIDGE RECONSTRUCTION SITE
 03/05/2017
LANE CLOSURE ON LOW-VOLUME 2-LANE HIGHWAY
 03/05/2017
RIGHT LANE CLOSURES AT NEAR SIDE OF INTERSECTIONS
 03/05/2017
LEFT LANE CLOSURES AT NEAR SIDE OF INTERSECTIONS
 03/05/2017
CENTER LANE CLOSURES AT NEAR SIDE OF INTERSECTIONS
 04/02/2012
TRAFFIC CONTROL FOR SIGNALS ONLY PROJECTS ON 2 OR 3 LANE MAJOR ROUTES
 04/02/2012
TRAFFIC CONTROL FOR SIGNALS ONLY PROJECTS ON 4 OR 5 LANE MAJOR ROUTES
 04/02/2012
TRAFFIC CONTROL FOR SIGNALS ONLY PROJECTS ON 4 OR 5 LANE MAJOR AND MINOR ROUTES
 04/02/2012
TRAFFIC CONTROL FOR SIGNALS ONLY PROJECTS ON 4 OR MORE LANE DIVIDED MAJOR ROUTES
 04/02/2012
TRAFFIC CONTROL FOR SIGNALS ONLY PROJECTS ON 4 OR MORE LANE DIVIDED MAJOR ROUTES AND 4 OR MORE LANE MINOR ROUTES
 
10/29/2021
SIDEWALK TRAFFIC CONTROL
T-WZ-56
 05/15/2022TRANSVERSE RUMBLE STRIP USE WITHIN WORK ZONES
T-WZ-60    FREEWAY RESURFACING SIGNING LAYOUT
T-WZ-61
 05/15/2022ROLLING ROADBLOCK DETAIL FOR DIVIDED HIGHWAYS
T-WZ-62  CONSTRUCTION ACCESS/EMERGENCY PULL-OFF ON FREEWAYS
T-WZ-63IB 24-0301/09/2024WORK ZONE IN THE VICINITY OF AN ENTRANCE RAMP
T-WZ-64IB 23-03 WORK ZONE IN THE VICINITY OF AN EXIT RAMP
T-WZ-65IB 24-03 LANE CLOSURE WITH LATE MERGE 
T-WZ-FAB1
  FLASHING YELLOW ARROW BOARD
T-WZ-PBR1  IB 23-0312/09/2022INTERCONNECTED PORTABLE BARRIER RAIL
T-WZ-PBR2 02/28/2020DETAILS FOR WORK ZONE CHANNELIZATION DEVICES
T-WZ-PCB1  IB 23-0312/09/202210 FOOT PORTABLE CONCRETE BARRIER RAIL
T-WZ-PCB2  IB 23-0312/09/202220 FOOT PORTABLE CONCRETE BARRIER RAIL
T-WZ-PCB2AIB 23-0312/09/202220 FOOT PORTABLE CONCRETE BARRIER RAIL STIFFENER TUBE
T-WZ-PCB3IB 22-0301/28/2022PORTABLE CONCRETE BARRIER RAIL DETAILS
T-WZ-PCB4  IB 23-0312/09/2022PORTABLE CONCRETE BARRIER RAIL ANCHOR PIN DETAILS
    

If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: July 26, 2024 at 12:21 PM